Skip to content

Hydropower lifetime restrictions- infeasibility #136

Description

@n7gonzalez

As of now, the simple hydropower module enforces historical flow rates. However, if a shorter lifetime is used (say 100 years rather than 200), leading some capacity to retire before 2050 or whatever the future investment period is, then there will not be enough installed capacity to meet historical hydro flows and the model becomes infeasible. We need to add a way to adjust historical flows as a factor of installed capacity.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions