Skip to content

docs: first monthly post UAT (HELD-FINAL, do not merge yet)#8

Merged
tieubao merged 4 commits into
mainfrom
chore/log-revival-05-uat
Jun 27, 2026
Merged

docs: first monthly post UAT (HELD-FINAL, do not merge yet)#8
tieubao merged 4 commits into
mainfrom
chore/log-revival-05-uat

Conversation

@tieubao

@tieubao tieubao commented Jun 25, 2026

Copy link
Copy Markdown
Contributor

🛑 HELD-FINAL: the mega-goal terminus. Do not merge until the deploy blocker is fixed. This is the one PR the loop does not merge; merging it (after publishing) is Han's end-review sign-off.

The whole revived journal, proven end to end on a real month, EXCEPT the live publish is blocked by a pre-existing deploy failure.

Ready: logwriter drafted June 2026 (155 PRs, privacy-trimmed), staged into the content vault by the 03 flow as consolelabs/content#4 (open). Reskin (07), writer (02), publish flow (03) all merged.

BLOCKER (Han must clear first): the log.console.so deploy has failed on every run for 30+ runs. It cannot clone the private vault submodule (consolelabs/content): GH_PAT lost read access (expired or consolelabs SSO authorization lapsed). The workflow wiring is correct (token: secrets.GH_PAT on a submodules: recursive checkout). Until fixed, nothing deploys, including the merged Arcade Neko reskin. The loop must not rotate secrets.

Han's path to close 05: (1) regenerate / re-SSO-authorize GH_PAT for consolelabs/content, update the Actions secret, re-run the deploy (this also takes the reskin live); (2) edit the draft to taste; (3) merge consolelabs/content#4 to publish; (4) screenshot the live post + fill the sign-off block in docs/proof/05-first-post.md; (5) merge this PR.

Full detail + sign-off block: docs/proof/05-first-post.md. Part of mega-goal log-revival.

tieubao and others added 4 commits June 25, 2026 09:49
Stages the June draft (privacy-trimmed) + the UAT proof scaffold + sign-off block. The first-post publish is blocked by a pre-existing deploy failure: GH_PAT lost read access to the private consolelabs/content submodule, so no deploy has succeeded in 30+ runs and the merged 07 reskin is not live. Han must fix the secret, then merge content PR #4 to publish. This PR is the held-final; the loop does not merge it.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
# Conflicts:
#	_meta/megagoals/log-revival/ROADMAP.md
@tieubao tieubao merged commit 236846e into main Jun 27, 2026
1 check passed
@tieubao tieubao deleted the chore/log-revival-05-uat branch June 27, 2026 21:05
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant