Skip to content

threads: T19 CLOSED on the outbox-join proof; qorpe-sync accepted; T21/T22 RFCs drafted - #171

Merged
omercelikdev merged 3 commits into
mainfrom
close-t19-and-shelf-rfcs
Aug 18, 2026
Merged

threads: T19 CLOSED on the outbox-join proof; qorpe-sync accepted; T21/T22 RFCs drafted#171
omercelikdev merged 3 commits into
mainfrom
close-t19-and-shelf-rfcs

Conversation

@omercelikdev

Copy link
Copy Markdown
Owner

The adopter PoC's final leg ran: saga state in the app's OWN DbContext, fault
injection proving the saga row and outbox rows commit or roll back in ONE
transaction. All three host properties now proven by test — T19 moves to
Closed threads. qorpe-sync flips to accepted on the owner's word (build next
week, two-store rig first). Goldpath.Approvals and Goldpath.FileExchange get
their RFCs (proposed) so the T21/T22 shelves are prepared; builds still wait
on their Ring B triggers per the §5.1 by-product rule.

Co-Authored-By: Claude Fable 5 noreply@anthropic.com

omercelikdev and others added 3 commits August 17, 2026 17:40
…1/T22 RFCs drafted

The adopter PoC's final leg ran: saga state in the app's OWN DbContext, fault
injection proving the saga row and outbox rows commit or roll back in ONE
transaction. All three host properties now proven by test — T19 moves to
Closed threads. qorpe-sync flips to accepted on the owner's word (build next
week, two-store rig first). Goldpath.Approvals and Goldpath.FileExchange get
their RFCs (proposed) so the T21/T22 shelves are prepared; builds still wait
on their Ring B triggers per the §5.1 by-product rule.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
…er decision

The owner pulled the T21/T22 Ring B triggers early ('nothing left incomplete').
Approvals: amount-laddered chains as data, four-eyes, depth-one delegation,
deadline escalation with top-rung expiry, worklist, full audit trail — 17
deterministic tests. FileExchange: rails as data with baked closures, file
contracts, idempotent (file,line) ingestion, quarantine-continues, zero-dup
replay/reprocess — 7-test planted-fault rig. Both wired into the manifest
schema and 'goldpath add feature'; RFCs flip to accepted with honest open DoD
rows (DB stores, template flags, console federation, adopter proofs).
Also lifts transitive SSH.NET past GHSA-q939-rpr3-3284 (NU1903 was red).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
The published @qorpe/ui moved 4 minors ahead; the gate went red by design.
Console rebuilt and 217/217 unit tests pass on 0.5.0 with the coverage
floors enforced.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@omercelikdev
omercelikdev merged commit 709bd57 into main Aug 18, 2026
4 checks passed
@omercelikdev
omercelikdev deleted the close-t19-and-shelf-rfcs branch August 18, 2026 06:37
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant