Skip to content

Add blog post for Tekton Pipelines v1.15.0 LTS release - #738

Merged
tekton-robot merged 2 commits into
tektoncd:mainfrom
vdemeester:blog-tekton-pipeline-v1.15.0-lts
Aug 31, 2026
Merged

Add blog post for Tekton Pipelines v1.15.0 LTS release#738
tekton-robot merged 2 commits into
tektoncd:mainfrom
vdemeester:blog-tekton-pipeline-v1.15.0-lts

Conversation

@vdemeester

Copy link
Copy Markdown
Member

Changes

Add a blog post for the Tekton Pipelines v1.15.0 LTS release. This covers highlights from both v1.14.0 and v1.15.0 releases (v1.14.0 didn't get its own blog post), including:

  • End-to-end OpenTelemetry tracing across all reconcilers (v1.14.0)
  • Configurable git resolver backoff (v1.15.0)
  • Grace period for transient container errors (v1.15.0)
  • Resolution reliability fixes (v1.15.0)
  • Sidecar and result extraction fixes (v1.15.0)
  • Cross-architecture entrypoint fix and stricter validation (v1.14.0)
  • LTS upgrade path table

Submitter Checklist

These are the criteria that every PR should meet, please check them off as you
review them:

See the contribution guide
for more details.

Covers highlights from both v1.14.0 and v1.15.0 releases, including
end-to-end OpenTelemetry tracing, configurable git resolver backoff,
grace period for transient container errors, resolution reliability
fixes, and sidecar/result fixes.
@tekton-robot tekton-robot added the size/M Denotes a PR that changes 30-99 lines, ignoring generated files. label Aug 18, 2026
The relref pointed at the content bundle directory instead of the
leaf file, which Hugo could not resolve, breaking the site build.
@tekton-robot

Copy link
Copy Markdown

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: AlanGreene

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@tekton-robot tekton-robot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Aug 31, 2026
@vdemeester vdemeester added the lgtm Indicates that a PR is ready to be merged. label Aug 31, 2026
@tekton-robot
tekton-robot merged commit dc26d5c into tektoncd:main Aug 31, 2026
8 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants